Gabriel B. Dadi, Ph.D., P.E., LEED AP


Professional Preparation

Ph.D., Department of Civil Engineering, University of Kentucky

M.B.A., Gatton College of Business and Economics, University of Kentucky

B.S., Department of Civil Engineering, University of Kentucky

 

Appointments

Assistant Professor, Department of Civil Engineering, University of Kentucky

Research Assistant, Department of Civil Engineering, University of Kentucky

Research Assistant, Breakthrough Strategy Committee, Construction Industry Institute

Project Engineer, NDS & Messer Construction

 

Selected Publications

1. Thomas, A., Davis, B., Dadi, G.B., and Goodrum, P.M. “A Case Study of the Impact of 100 ksi Steel Reinforcement on Concrete Productivity in Buildings.” ASCE Journal of Construction Engineering and Management. In press.

2. Dadi, G.B., Goodrum, P.M., Taylor, T.R.B., and Carswell, C.M. “Cognitive Workload Demands Using 2D and 3D Spatial Engineering Information Formats.” Journal of Construction Engineering and Management, ASCE. In review.

3. Dadi, G.B., Taylor, T.R.B., Goodrum, P.M., and Maloney, W.F. “Performance of 3D Printed Models as a Means for Spatial Engineering Information Visualization.” Journal of Automation in Construction, Elsevier. In review.

4. Dadi, G. B., Goodrum, P.M., Saidi, K.S., Brown, C.U., and Betit, J.W. (2012). “A Case Study of 3D Imaging Productivity Needs to Support Infrastructure Construction.” Proceedings from CRC ’12. Construction Research Congress 2012. West Lafayette, IN.

5. Dadi, G.B., Safa, M., Goodrum, P.M., Haas, C.T., Caldas, C.H., and MacNeel, D. (2012). “Improving Concrete Labor Productivity through the Use of New and Emerging Innovations.” Proceedings from CRC ’12. Construction Research Congress 2012. West Lafayette, IN.

6. Haas, C.T., Goodrum, P.M., Caldas, C.H., Boyd, W., Gustafson, D., Dadi, G.B. (2012). “Construction Productivity Research Program – Phase IV.” Construction Industry Institute. Research Team 252, Research Summary 252-1c. The University of Texas at Austin.

7. Goodrum, P.M., Haas, C.T., Caldas, C.H., Zhai, D., Shan, Y., Dadi, G., Gouett, C., Safa, M., Zhang, D., Benzekri, M., and Kim, J.Y. (2012). “Construction Productivity Research Program – Phase III.” Construction Industry Institute. Research Team 252, Research Report 252-11. The University of Texas at Austin.

8. Goodrum, P.M., Haas, C.T., Caldas, C.H., Zhai, D., Shan, Y., Dadi, G., Gouett, C., Safa, M., Zhang, D., Benzekri, M., and Kim, J.Y. (2012). “Construction Productivity Research Program – Phase II.” Construction Industry Institute. Research Team 252, Research Report 252-11a. The University of Texas at Austin.

9. Saidi, K.S., Cheok, G.S., Franaszek, M., Brown, C.U., Swerdlow, J., Lipman, R.R., Katz, I., Golparvar-Fard, M., Goodrum, P., Akula, M., Dadi, G., Ghadimi, B. (2011). “Development and Use of the NIST Intelligent and Automated Construction Job Site Testbed,” NIST TN-1726, Gaithersburg, MD: National Institute of Standards and Technology.

10. Caldas, C.H., Goodrum, P.M., Haas, C.T., Dadi, G.B., Kim, J.Y., MacNeel, D., Safa, M., Shan, Y., Zhang, D.. (2011). “Construction Productivity Research Program – Phase III.” Construction Industry Institute. Research Team 252, Research Summary 252-1b. The University of Texas at Austin.