Equipment Information and Request Forms
Tool status:
= Up
= Limited (talk to Brian or Chuck)
= Down
You can check the equipment availability here
Annealing Furnace Operation Proceedure Note: May need to borrow temp controller from Oxidation furnace. |
Atomic Force Microscope Operation Proceedure On loan. Please select AFM w/isolation chamber |
Atomic Force Microscope with Isolation Chamber Operation Proceedure
|
|||
| Atomic Layer Deposition Operation Proceedure Al and Hf precusors only. |
|
Calculation Stations
|
Cleanbench - Solvent (rm 369) Operation Proceedure |
||
Cleanbench - Acid (rm 365) Operation Proceedure
|
Cold Probe Operation Proceedure Note: Can be used at room temperature. Yes I know. That makes it just a probe system. |
CV plotter Operation Proceedure Note: Working. Need to find place to install it. |
|||
Dicing Saw Reservation form Operation Proceedure
|
Doping Furnace Operation Proceedure Note: tube repair. |
E-Beam Evaporator
|
|||
Electron Beam Lithography Operation Proceedure SEM imaging only |
Film Thickness Monitor - Leaving Soon!
Reservation form Operation Proceedure
|
General Furnace
Operation Proceedure Note: Tube is back in. |
|||
Inert gas oven Operation Proceedure .
|
Mask Aligner Information Operation Proceedure
|
Oxidation Furnace Operation Proceedure Note: May need to borrow temp controller from annealing furnace |
|||
Plasma Enhanced Chemical Vapor Deposition (PECVD)
|
Plasma Etch (Microwave Induced) Operation Proceedure |
Quartz Crystal Microbalance with Dissapation (QCM-D) |
|||
Rapid Thermal Processing (RTP) Operation Proceedure
|
Reactive Ion Etching (RIE) Operation Proceedure
|
Spectroscopic Ellipsometer Operation Proceedure |
|||
Spin Coater Information
|
Sputtering System (Small) Au sputter depositions must be made with a Center staff member. Please contact Bonnie (ms.bonnilu@gmail.com) or Matt (Matt.Deye@uky.edu) to make an appointment. Their calendar is published here. |
||||
|
Thermal Evaporator (Edwards) Conversion to turbo pumped unit.
|
Thermal Evaporator 2 (Bell Jar) NOTE: Do not open the high vac valve unless it reads 5x10-1 torr or better. Please continue to use the backing line at 2x10-2 or better as before. |
|||
|
Equipment Maintenance Request or Issue Reporting |
|
|
.





