Equipment Information and Request Forms
Tool status:
= Up
= Limited (talk to Brian or Chuck)
= Down
You can check the equipment availability here
Annealing Furnace Operation Proceedure Note: May need to borrow temp controller from Oxidation furnace. |
Atomic Force Microscope Operation Proceedure On loan. Please select AFM w/isolation chamber |
Atomic Force Microscope with Isolation Chamber Operation Proceedure
|
|||
| Atomic Layer Deposition Works but vac gauge is not accurate. |
|
Calculation Stations
|
Cleanbench - Solvent (rm 369) Operation Proceedure |
||
Cleanbench - Acid (rm 365) Operation Proceedure
|
Cold Probe Operation Proceedure Note: Can be used to about 100 degrees Kelvin. Contact Brian. |
Dicing Saw Reservation form Operation Proceedure |
|||
E-Beam Evaporator
|
Electron Beam Lithography Operation Proceedure |
Environmental Scanning Electron Microscopy (ESEM) with Engery Dispersive Spectroscopy (EDS/EDX) Reservation form Operation Proceedure Note: Contact Brian for use.
|
|||
General Furnace Operation Proceedure Note: Tube is back in. |
High Temp Furnace Information Operation Proceedure Please contact Brian for use.
|
Inert gas oven Operation Proceedure |
|||
Mask Aligner Information Operation Proceedure .
|
Oxidation Furnace Operation Proceedure Note: May need to borrow temp controller from annealing furnace
|
Plasma Enhanced Chemical Vapor Deposition (PECVD) |
|||
Plasma Etch (Microwave Induced) Operation Proceedure
|
Probe station and Electronics Rack Reservation form Operation Proceedure Note: Contact Brian for use. |
Quartz Crystal Microbalance with Dissapation (QCM-D) |
|||
Rapid Thermal Processing (RTP) Operation Proceedure
|
Reactive Ion Etching (RIE)
|
Spectroscopic Ellipsometer Operation Proceedure |
|||
Spin Coater Information
|
Sputtering System (Small) Au sputter depositions must be made with a Center staff member. Please contact student technicians. Their calendar is published here. |
||||
|
Thermal Evaporator (Edwards) Conversion to turbo pumped unit.
|
Thermal Evaporator 2 (Bell Jar) NOTE: Do not open the high vac valve unless it reads 5x10-1 torr or better. Please continue to use the backing line at 2x10-2 or better as before. |
|||
|
Equipment Maintenance Request or Issue Reporting |
|
|
.





